Minelab F3 Service Manual Page 18

  • Download
  • Add to my manuals
  • Print
  • Page
    / 42
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 17
F3 Field Service Manual
Page 18
Figure 16: Removing the Coil Retainer
Lift the lower shaft with lower camlock assembly out of the coil top.
Carefully pull the coil cable out from inside the shafts.
If necessary, remove the coil pin for use with the replacement coil.
NOTE
If there is any damage to the coil or coil cable, the coil must be replaced. There are no
repairable parts on the coil.
b. To fit a new coil:
Ensure a skid plate is fitted to the coil.
If necessary connect a coil pin by: (Figure 17)
- inserting the coil pin into the top spirals of the coil cable
- positioning the coil pin so that the straight portion of cable is aligned with the
channel in the coil pin
- pressing the coil pin onto the coil cable, so that it is firmly held in position
Figure 17: Inserting the Coil Pin
Page view 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 41 42

Comments to this Manuals

No comments